Upcoming Trainings & Events

Washington APEX Accelerator Washington APEX Accelerator

Coastal 29 Remove Fish Barriers Project Outreach - Kiewit

10:00 - 11:30 am

March 21, 2023

-

No Fee

In partnership with Washington PTAC, Kiewit is looking to solicitate quotes on the upcoming Coastal 29 Fish Bundle Project for the listed items:


FOM (Fully Operated & Maintained) Equipment

  • Trucking (Solo, T&T, Side Dump)    
  • Vac Truck
  • Water Truck                                  
  • Sweeper Truck

Permanent Material Suppliers

  • Aggregate                                            
  • Cable Fence Supply
  • Concrete                                              
  • Geotextile
  • Grout                                                  
  • Large Woody Material
  • Lumber – Lagging                                
  • Pile Supply (Steel & Timber)
  • Pipe                                                    
  • Signage

Small Tools & Supplies

  • Diversion Pump System
  • Green Waste Grinding
  • Temporary Erosion and Sediment Control
  • Temporary Shoring (Street Plates, Shoring Boxes, Etc)
  • Dump Sites (Dirt, Concrete, Asphalt, Green Waste)
  • Traffic Control Supplies

Subcontractors

  • Barrier                                                
  • Concrete Pumping
  • Cranes                                              
  • Dewatering
  • Drilling                                                
  • Fish Exclusion
  • Guardrail                                            
  • HMA Paving
  • HMA Planing                                        
  • Landscaping
  • Logging                                              
  • Pigmented Sealing
  • Rebar                                                
  • Rebar
  • Stripilation                        
  • Welding


Join us for a workshop to meet representatives from Kiewit and discuss this upcoming opportunity. Meeting will also be available virtually via Zoom.

Contact for More Information:

Grady Smith

gsmith@thurstonedc.com360.968.4846